Save time and money
by comparing competing quotes easily.
Set your requirements once and drop in supplier quotes in any format. AI pulls out the facts, flags mandatory gaps and lays every quote out on the same terms, side by side. Your team makes the call.
See AI Quotation Comparison in 30 seconds
Set your requirements once and drop in supplier quotes in any format: ChemCapital's AI pulls out the facts for you to review, measures every offer against your RFQ, catches mandatory gaps before ranking, and scores offers by your priorities while your team decides.
Video transcript
Three suppliers. Three quotes. Which one actually meets your RFQ? Set your requirements once. Then drop in the quotes, whatever the format. AI reads them and pulls out the facts. You review. Every offer, side by side, measured against your RFQ. Mandatory gaps are caught before anything is ranked. Scores follow your priorities. Nothing hidden. AI explains the tradeoffs. Your team decides. ChemCapital. Quote comparison, done properly.
How the comparison works
The AI reads the quotes. Your team makes the call.
01
Upload
Add the PDF quotations from competing suppliers, up to three per comparison.
02
Extract
AI reads each document and pulls out price, lead time, materials, certificates and scope, with the evidence for each.
03
Compare
Fixed rules score every quote on commercial, technical, delivery, compliance and risk, so the same quotes always give the same result.
04
Decide
See the comparison table, any mandatory fails and a short written summary, then award to the supplier you choose.
Try it with your own quotations
Upload up to 3 competing supplier quotations (PDF or plain text). We extract, normalise, and compare them automatically. No signup, no email required.
Worked examples
See a finished comparison
Realistic scenarios from pharma and chemicals, prepared in advance and not live. Each one shows a different trap the comparison catches: a certification gap, a material deviation, a scope exclusion.
Centrifugal Pump: Reactor Feed P-101A
Transfer of sodium hypochlorite solution (15%, 60 °C) from reactor R-101 to storage. ATEX Zone 1 classified area. Mandatory: ATEX Directive 2014/34/EU + CE. Motor, baseplate, and coupling guard must be in scope.
- PumpCo International: 1 mandatory requirement not met
- ATEX certification missing: mandatory fail for Zone 1 area
- Motor excluded from scope: additional cost and coordination risk
Disqualified quotes remain visible for reference but are not eligible for a recommendation.
| Centrifugal Pump | PumpCo InternationalMandatory Fail Italy Disqualified | FlowTech GmbH Germany Best Value | Rapid Pump Solutions Ltd United Kingdom Fastest |
|---|---|---|---|
| Commercial | |||
| Total Price | €12,500 | €18,200 | €15,800 |
| Incoterm | EXW | DAP | FCA |
| Payment Terms | 30% advance, 70% before dispatch | Net 30 days from invoice | 50% advance, 50% prior to dispatch |
| Warranty | 12 months from commissioning | 24 months from delivery | 12 months from delivery |
| Delivery | |||
| Lead Time | 8 to 10 weeks ex works | 12 weeks including motor and factory test | 6 weeks from order |
| Lead Time (Days) | 70 days | 84 days | 42 days |
| Manufacturing | Bologna, Italy | Düsseldorf, Germany | Manchester, UK |
| Technical | |||
| Materials | Wetted parts: 316L Stainless Steel (AISI 316L) | Wetted parts: Hastelloy C-276. Shaft seal: PTFE/Carbon/SiC. Non wetted: 316L SS. | Casing and impeller: 316L SS. Hastelloy option available at +EUR 3,400 (quoted separately). |
| Technical Highlights | Flow: 10 m³/h @ 30 m head. 316L SS wetted, double mechanical seal. | Flow: 10 m³/h @ 32 m head (margin). Hastelloy C-276 for enhanced corrosion resistance. VFD compatible motor. | Flow: 10 m³/h @ 30 m head. Stock availability allows 6 week delivery. ATEX rated (details to be confirmed). |
| Compliance | |||
| Certifications |
|
|
|
| Scope | |||
| Scope Included |
|
|
|
| Scope Excluded |
| — |
|
| Documentation | |||
| Documents Included |
|
|
|
| Risks & Deviations | |||
| Major Deviations |
| — |
|
| Unresolved Questions | — | — |
|
| Scores (Deterministic) | |||
| Commercial Score | FAIL | 52/100 | 65/100 |
| Technical Score | FAIL | 91/100 | 80/100 |
| Delivery Score | FAIL | 70/100 | 98/100 |
| Compliance Score | FAIL | 95/100 | 82/100 |
| Risk Score | FAIL | 88/100 | 68/100 |
| Overall Weighted Score | FAIL | 74/100 | 74/100 |
| Rank | Disqualified | #1 | #2 |
Transparent by design
This is not a black box AI ranking system. It is a structured procurement comparison tool that keeps engineering teams in control.
How it works
Comparison is step three of four.
The free comparison above is the middle of the process. On ChemCapital the RFQ before it and the order after it sit on the same record.
- 0101
A requirement suppliers can price
The item list, specifications and attachments go out complete, with one response deadline, so every supplier prices the same scope. Nothing falls out into email.
Reduces supply risk
- What goes away
- Clarification rounds
- Scope gaps
- Quotes for the wrong thing
- 0202
The right suppliers, reached at once
AI search finds suppliers that match the requirement. Add your approved vendors and your own contacts, and one RFQ reaches all of them at the same moment.
Reduces supply risk and cost
- What goes away
- Forty separate emails
- Depending on a single source
- The supplier you never found
- 0303
Quotes compared like for likeThis page
Quotations arrive in one structure: line items, lead times, assumptions. Compare them side by side, see compliance failures flagged, and request revisions on the record.
Reduces cost
- What goes away
- Seven PDFs in a spreadsheet
- Hidden exclusions
- Paying more than you needed to
- 0404
Order issued, delivery tracked
The purchase order comes straight from the winning quote. The supplier confirms with a reference, posts milestones and logs delivery on the same record as the drawing it started from.
Reduces supply risk
- What goes away
- Chasing by phone
- Surprise delays
- An audit trail in someone's inbox
Every RFQ, revision, quotation and order is time stamped and attributable to a person. The trail can be exported for audit at any point.
Compare your next quotes on ChemCapital
Send one RFQ, receive the quotes on one record and compare them like for like, then issue the order from the same place.
